John Deere S780 Combine Shipping from Illinois to Paraguay


See how Atlantic Project Cargo shipped a John Deere S780 combine from Illinois to Paraguay via Montevideo using inland, ocean, and onward river transport.
How Atlantic Project Cargo moved a rotary combine harvester from Illinois to Buenos Aires — fully SENASA-compliant, on schedule, with zero unexpected costs or customs holds.
Need similar shipping?
Get a Quote
Transporting oversized agricultural machinery internationally requires far more than standard freight coordination. In this project, Atlantic Project Cargo managed the end-to-end shipment of a New Holland CR9070 combine harvester from Illinois, USA to Buenos Aires, Argentina — covering inland heavy haul transport, full equipment preparation, SENASA phytosanitary compliance, and flat rack ocean freight execution.
This case follows the shipment of a New Holland CR9070 combine harvester from Illinois, USA to Buenos Aires, Argentina — combining inland heavy haul, equipment modification, and strict phytosanitary compliance.
As one of the largest rotary combines in its class, the CR9070 presents logistical challenges due to its size and configuration. Moving this type of equipment is not a standard shipping task — it requires engineering-based planning, regulatory awareness, and controlled execution at every stage.
The objective was clear: deliver the machine on time, fully compliant with Argentine import requirements, and without unexpected costs or delays.
Transporting oversized agricultural machinery across international borders requires precise coordination, regulatory expertise, and specialized handling.
Why projects like this succeed — or get stuck at the port.
Most delays and extra costs occur before cargo reaches the port — in prep and compliance.
Improper equipment configuration can make a shipment impossible or far more expensive.
Choosing the wrong transport method increases risk, handling complexity, and damage potential.
SENASA and similar authorities enforce strict biosecurity — cleaning and fumigation are non-negotiable.
Incomplete documentation is one of the top causes of customs delays and cargo holds.
Structured logistics planning eliminates delays and protects the timeline end-to-end.
This case follows the shipment of a New Holland CR9070 combine harvester from Illinois, USA to Buenos Aires, Argentina — combining inland heavy haul, equipment modification, and strict phytosanitary compliance.
The CR9070 exceeds standard transport limits. Bridge clearances, road restrictions, and weight limits must be mapped before the equipment moves — not reactively.
Bridge heights, restricted segments, and weight limits analyzed up-front. All permits secured before pickup, so inland transport moved without a single mid-route surprise.
Large agricultural tires push overall height and width past transport and vessel requirements. Without modification, direct transport is impossible.
Large tires removed and transported separately. Main unit stabilized and prepped to meet both road limits and vessel loading profiles.
Argentina enforces strict phytosanitary inspection. Any trace of soil or plant residue can trigger rejection at the port of entry — plus delay and cost.
Full industrial wash removed all soil and organic residue. Professional fumigation completed with SENASA-compliant certification issued before vessel loading.
Inaccurate export papers or missing certificates are among the top reasons for customs holds. Any discrepancy can block the shipment entirely.
Inspection certificates, export paperwork, and phytosanitary documents prepared in parallel with cleaning — shipment cleared on the first customs pass.
From booking to delivery — the full 30–35 day journey, phase by phase.
Combine loaded on RGN trailer at origin site in Illinois.
Day 1Heavy-haul move to export port, under secured permits.
Several daysTire removal, dimensional reduction, and securing for ocean.
2–3 daysIndustrial cleaning, fumigation, SENASA certification, docs.
ParallelFlat rack container, blocked & braced for maritime transit.
~24 daysCleared Argentine customs first pass, handed over to client.
Day 30–35Nothing improvised. Every step below was pre-planned and validated before execution began.
To move the CR9070 from Illinois to the export port, a Removable Gooseneck (RGN) trailer was selected. This configuration lets the load sit lower, improving stability during transport and reducing clearance risks across the route.
The choice wasn’t incidental — RGN simplifies loading and unloading and provides safer handling for high-value agricultural machines. A full route analysis was completed before pickup: bridge heights, restricted segments, weight limits, and permits all resolved up-front.
Lower deck height — clears low bridges oversized machinery can’t cross on a standard flatbed.
Every mile mapped for clearances, weight, and restrictions before the truck moved.
All oversize permits in hand at pickup — zero roadside interruptions.
Several risks were addressed during inland transport — load instability, route violations, and potential equipment damage. Each was mitigated through proven securing methods, detailed route planning, and controlled handling procedures.
Controlled via multi-point securing and balanced weight distribution on the RGN deck.
Pre-mapped clearances and pre-secured oversize permits eliminated detour and stop risk.
Controlled loading, protected surfaces, and continuous in-transit monitoring.
The most important modification was removing the large agricultural tires. This cut overall transport dimensions so the combine met both road and vessel requirements — without it, direct shipment would have been impossible.
Removed components were secured and transported separately to prevent damage. The main unit was stabilized and every exposed element was checked against shift risk during transit. This stage is often underestimated, but it directly determines whether the shipment is viable at all.
Before export, the combine went through a full industrial cleaning process — all traces of soil, crop residue, and organic material removed. For shipments to Argentina this is not optional: contamination results in immediate rejection at the port of entry.
Cleaning was followed by a pre-export inspection verifying the machine’s identity, condition, and export compliance. A complete documentation package was prepared in parallel, and professional fumigation under SENASA guidelines completed with proper certification before departure..
All soil, crop residue, and organic material removed to meet Argentine biosecurity standards.
Pre-export inspection verified identity and condition. Full documentation pack prepared in parallel with prep.
Professional fumigation with valid certification — no quarantine, no rejection risk on arrival.
Transition to the export phase. Once inland transport and preparation were complete, the CR9070 arrived at the port ready for export processing. At this point the focus shifted from transport execution to regulatory compliance and international shipping requirements.
Due to its size, the CR9070 was transported on a flat rack container — the preferred method for oversized cargo that won’t fit a standard container. Flat rack shipping provides the flexibility needed to load and secure large machinery safely.
Once loaded, the combine was secured with blocking, bracing, and heavy-duty lashing systems designed to prevent movement during ocean transit. A stowage inspection before departure verified that all securing methods met maritime safety standards.
Lower deck height — clears low bridges oversized machinery can’t cross on a standard flatbed.
Every mile mapped for clearances, weight, and restrictions before the truck moved.
All oversize permits in hand at pickup — zero roadside interruptions.
Whether you have a small recreational boat or a luxurious yacht, Atlantic Project Cargo will provide you with top-tier shipping services.
Every phase of the shipment, what happened in it, and how long it took — door to door.
The shipment was completed according to plan, with every objective achieved. The combine was delivered on schedule, cleared customs without delays, and required no additional costs beyond the initial scope. All inspections passed. The equipment arrived fully compliant and ready for immediate operation — a direct outcome of structured logistics planning and consistent execution across every stage.
On schedule within the committed 30–35 day window
First-pass customs clearance at Argentine port of entry
Final invoice matched the original scope and budget
Combine reassembled and running on arrival — no transit damage
Atlantic Project Cargo handled everything end-to-end — the combine arrived when they said it would, cleared customs without a single hold, and we were able to put it straight to work. No surprise bills, no scrambling at the port.
Benicio Cañete
Agricultural importer, Buenos Aires


See how Atlantic Project Cargo shipped a John Deere S780 combine from Illinois to Paraguay via Montevideo using inland, ocean, and onward river transport.



This case follows the export of a used 2012 Case IH 8120 Axial-Flow combine from Albany, Georgia, sourced through JumboBee for a buyer in Ismailia Governorate, Egypt. Atlantic Project Cargo coordinated the shipment from pickup in Georgia through delivery in Egypt. The Case IH 8120 is a Class 7 single-rotor grain combine, and its weight, […]