A step deck trailer is a flatbed trailer with two deck levels, a short upper deck and a longer lower deck behind it. The lower deck sits closer to the ground than a standard flatbed. It carries machinery too tall for a flatbed that does not need a lowboy.
Also known as: drop deck trailer, single drop trailer.
How a Step Deck Trailer Works
The upper deck sits over the fifth wheel, and the main deck steps down behind it. The lower deck lets taller loads stay within road height limits more often than on a flatbed. Most step decks have no well, so the whole main deck is usable length.
Machines usually drive on from the rear with ramps, or are loaded by crane or forklift. Wheeled and tracked units are blocked and chained to the deck before the move. Some step decks have fold-down ramps or extendable decks for longer loads.
For example, a telehandler moving from a dealer in Ohio to the port of Baltimore often fits a step deck. Its attachments can ride on the upper deck.
Why a Step Deck Trailer Matters for Heavy Equipment Shipping
Many mid-size machines are too tall for a flatbed but fit a step deck without a height permit. Step decks are more widely available than lowboys and suit long, lighter loads. Choosing the right trailer can avoid an oversize move or a disassembly.
Atlantic Project Cargo matches the trailer to each machine through its heavy equipment shipping service and plans the inland leg with multimodal transportation.
| Feature | Step deck trailer |
|---|---|
| Deck | Short upper deck over the truck and a longer lower main deck. |
| Loading | Rear ramps, crane or forklift. |
| Typical loads | Telehandlers, mid-size tractors, small excavators and loaders. |
| Limits | The main deck is higher than a lowboy’s well. |
| Suits | Long or medium-height machines within road limits. |
Step Deck Trailer vs Lowboy Trailer
A step deck has a longer usable deck, while a lowboy has a lower well for taller loads. A lowboy also carries heavier machines with more axles.
A step deck fits machines that are long or of medium height. A lowboy is needed when the machine is too tall or too heavy for a step deck.
Common Mistakes
- Measuring the machine alone and not its height once it sits on the lower deck.
- Booking a step deck for a machine that is too tall and needs a lowboy.
- Using ramps that are too steep for low-clearance machines.
- Leaving buckets or booms raised instead of lowering them for the move.
- Not checking that items on the upper deck keep the axles within their limits.
FAQ